CorpusMarket Robotics

Robotics in the construction industry

Robots can already lay out a floor plan and tie rebar on a flat deck. They cannot yet frame a wall around a crooked slab or hang a door that will not sit square. Closing that gap takes video of real crews doing real work, and contractors are the ones who have it.

By Linus Näslund, Co-Founder

  • No cost to apply
  • Nothing shared before we talk
  • Reply within 2 business days
Contents07
  1. 01Where robots in construction stand today
  2. 02Why robots struggle with the rest
  3. 03What labs want recorded on a construction site
  4. 04What recording looks like on site
  5. 05What has to be settled first
  6. 06Does this put crews out of work?
  7. 07Next step for a contractor

Where robots in construction stand today

Construction robotics is real, but it is narrow. The machines working on sites today each do one job on a surface that has been prepared for them.

  • Layout robots print lines on a slab from the building model.
  • Rebar-tying machines travel over a bridge deck and tie intersections.
  • Bricklaying and drywall-finishing robots work on long, straight, unobstructed walls.
  • Drones and rovers scan progress and compare it with the plans.
  • Demolition and excavation machines are steered remotely by an operator.

What these have in common is that the task does not change much from one minute to the next. A crew's day looks nothing like that. A framer checks a stud for crown, shims a plate because the slab is out of level, and cuts a notch around a pipe that was not on the drawings. None of that is written down anywhere. It lives in hands and eyes.

Why robots struggle with the rest

A robot learns a physical task from examples. For text and images, the examples already existed on the internet. For hands-on work they do not. There is no archive of what it looks like, from the worker's own point of view, to hang a sheet of drywall in a stairwell.

Three things make construction especially hard for a robot:

  1. Nothing is standard. Every site, wall and day is different, so a robot cannot memorise one motion.
  2. The materials push back. Lumber is warped, mud sets, pipe springs. The worker adjusts by feel.
  3. The work is two-handed and full-body. One hand holds, the other fastens, a knee braces the sheet.

Labs building general-purpose robots have concluded that the way through is a very large amount of video of people doing this work, recorded from where the worker's eyes are. Our guide to egocentric data collection explains why that viewpoint matters, and how robots learn covers what the video is used for.

What labs want recorded on a construction site

Labs ask for ordinary tasks, done at ordinary speed, by people who do them every day. A contractor does not need to stage anything. Typical requests include:

TradeTasks labs ask for
Framing and carpentryMeasuring, cutting, nailing, setting plates, hanging doors, trim
DrywallHanging, taping, mudding, sanding
Tile and flooringLayout, cutting, setting, grouting
ConcreteForming, placing, finishing
Mechanical, electrical, plumbingRough-in, fitting, terminations
GeneralTool handling, material handling, cleanup

Variety is worth more than polish. The same task on five different sites teaches a robot more than the same task five times in one room. For the mechanical trades, see the page on plumbing, electrical, HVAC and auto work.

What recording looks like on site

In the programme we introduce businesses to, run by our partner Amelia Robotics, a worker wears a phone on a hardhat mount with the camera pointing down at the hands. The worker starts a recording in the programme's app, does the agreed task, and stops it. Recordings are reviewed, and the business is paid for the hours that are approved.

A few practical points, described in more detail on how it works:

  • It is voluntary for each worker. Nobody records who does not want to.
  • The business decides the split. How pay is shared between the worker and the company is set by the business together with the programme.
  • Setup is covered on a call. The programme goes through tasks, mounts and the app before anyone starts.

What has to be settled first

A construction site is rarely one company's space. The owner, the general contractor, other trades and sometimes the public are all there. Recordings show hands and work surfaces, and they can also catch faces, drawings and the client's property.

How that is handled differs from job to job. Some general contractors and owners restrict filming in the contract; some sites are open. A subcontractor may be free to record in its own shop and not on a client's site. These questions are gone through for each business before recording starts. Our page on recording at work describes how the topic usually comes up.

Does this put crews out of work?

It is a fair question to ask about recordings made to train robots. The honest picture is that robots are furthest along in the dull, heavy and dangerous parts of the job, and nowhere near the judgment calls that make a good tradesperson. Many contractors also say their problem is finding enough skilled people, not having too many. We go through what is known and what is guesswork in will robots take jobs.

Next step for a contractor

If your crews do hands-on work and you are curious whether it fits, tell us about your business. It takes two minutes and commits you to nothing. We get back to you within 2 business days, and nothing is shared outside CorpusMarket before we have spoken with you.

Questions and answers

Frequently asked questions

Will AI replace construction workers?

Not in any near-term picture that the technology supports. Robots in construction handle narrow, repetitive tasks on prepared surfaces. The work that fills a crew's day, such as fitting materials to what is actually there, working around other trades and fixing what went wrong, is exactly what robots cannot yet do. That is why labs are paying for recordings of it.

Which construction tasks do robotics labs want recorded?

Hands-on tasks with a clear start and finish. Framing, drywall hanging and finishing, tiling, trim carpentry, rough plumbing and electrical, concrete finishing, and tool handling in general. The exact list is agreed with the programme before anyone starts.

Does recording slow the crew down?

The camera is a phone on a hardhat mount, pointing down at the hands, so both hands stay free. Workers record the tasks that were agreed and do them the way they normally would. How much to record on a given day is up to the business.

What about the client's site and other trades on camera?

That depends on the job. Some sites and clients have their own rules about filming, and other trades have not agreed to anything. What can be recorded where is gone through for each business before recording starts, and it can differ from one project to the next.

Does the general contractor or the worker get paid?

The programme pays the business for recording hours that pass its quality review. How that is shared with the workers who record is set by the business together with the programme.

Next step

Tell us about your business

If your crew does hands-on work, a robotics lab may pay for video of it. Send your details and we will tell you whether it fits and what happens next.

  • No cost to apply
  • Nothing shared before we talk
  • Reply within 2 business days

CorpusMarket is independent of Amelia Robotics and may receive a referral fee if your business joins their programme. Nothing on this page is a promise of income.